Day 11# Complete, heading into week 3.

A site set out has been done through a Surveyor to be on the safe side and ensure we are building this 55m2 extension in the correct relocation. We will receive a certificate confirming this. The excavation, foundations, steel work tired, inspection passed, footings poured, block work layed and filled.